Deformation of the Zhangjiazhuang high-speed railway tunnel: an analysis of causal mechanisms using geomorphological surveys and D-InSAR monitoring

MENG Xing-min, QI Tian-jun, ZHAO Yan, DIJKSTRA Tom, SHI Wei, LUO Yin-fei, WU Yuan-zhao, SU Xiao-jun, ZHAO Fu-meng, MA Jin-hui, ZHANG Yi, CHEN Guan, YUE Dong-xia, ZHANG Mao-sheng

山地科学学报(英文版) ›› 2021, Vol. 18 ›› Issue (07) : 1920-1936.

山地科学学报(英文版) ›› 2021, Vol. 18 ›› Issue (07) : 1920-1936.

Deformation of the Zhangjiazhuang high-speed railway tunnel: an analysis of causal mechanisms using geomorphological surveys and D-InSAR monitoring

  • {{article.zuoZhe_CN}}
作者信息 +

Deformation of the Zhangjiazhuang high-speed railway tunnel: an analysis of causal mechanisms using geomorphological surveys and D-InSAR monitoring

  • {{article.zuoZhe_EN}}
Author information +
文章历史 +

本文亮点

{{article.keyPoints_cn}}

HeighLight

{{article.keyPoints_en}}

摘要

{{article.zhaiyao_cn}}

Abstract

{{article.zhaiyao_en}}

关键词

Key words

本文二维码

引用本文

导出引用
{{article.zuoZheCn_L}}. {{article.title_cn}}[J]. {{journal.qiKanMingCheng_CN}}, 2021, 18(07): 1920-1936
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2021, 18(07): 1920-1936
中图分类号:

参考文献

参考文献

{{article.reference}}

基金

版权

{{article.copyrightStatement_cn}}
{{article.copyrightLicense_cn}}

Accesses

Citation

Detail

段落导航
相关文章

/